Prefabricated Light Weight Frame Steel Structural Factory Design

Loading Port:Tianjin

Payment Terms:TT OR LC

Min Order Qty:50 m²

Supply Capability:10000 m²/month

Product Description:

Prefabricated Light Weight Frame Steel Structural Factory Design




Typical project


Prefabricated Light Weight Frame Steel Structural Factory Design

Prefabricated Light Weight Frame Steel Structural Factory Design

Prefabricated Light Weight Frame Steel Structural Factory Design

Prefabricated Light Weight Frame Steel Structural Factory Design




Description:

Size

length X Width X Eave height, roof Slope

Type

single slope, double slope, muti-slope;

single span,double-span ,multi-span;

single floor, double floors

Column and beam

hot rolled or weld H section steel, grade Q345(S355JR)

Bracing

X or V or other type bracing made from angle , round pipe

Purlin

C or Z section size of C100~C320,Z160~Z300

Roof and wall

single colorful corrugated steel sheet;

sandwich panel with insulation of EPS, ROCK WOOL or PU

Accessories

semi-transparent skylight belts, ventilators, down pipe, out gutter etc.

Surface

frame steel:twice anti-corrosive primer and one finish paint;

secondary steel:hot galvanized

Package and loading

nude cargo loaded into 40'HQ


FAQ

1.    Q: How much is this house?

A: Please provide with your house drawing and project location, because different design, different location effect the house materials quantity and steel structure program.

2.    Q: Do you do the turnkey project?

A: Sorry, we suggest customer to deal with the foundation and installation works by self, because local conditions and project details are well knowb by customers, not us. We can send the engineer to help.

3.    Q: How long will your house stay for use?

A: Our light steel prefab house can be used for about 30 years.

4.    Q: How long is the erection time of one house?

A: for example one set of 200sqm , 6 workers will install it within 7 days.

5.    Q: Can you do the electricity,plumbing and heater

AThe local site works had better to be done by the customers.