Loading Port:Tianjin
Payment Terms:TT OR LC
Min Order Qty:50 m²
Supply Capability:50000 m²/month
Prefabricated House with CE Certificate Made in China
The advantage of two-storey steel frame building :
1.High stability, flexible design, appearance beautiful.
2.Construction period short, energy conserving.
3.Prefab house adopt galvanized open web steel as structural steel frame.
4.All materials have a good fireproof and heat insulation performance.
5.All the components of villa are prefabricated before leaving factory, with the advantage of easy erection.
6.Eight skilled workers can finish installation of 150 SQM in 15 days
7.Easy to assemble and dissameble for several time without damage and not bring out building debris
8.Low repair and maintenance costs.
9.High- strength, windproof and reliable load- bearing steel structures
Components of light steel structure villa
The outside wall is composed by outside board, waterproofing layer, structure board, Steel shelf, heat preservation material and inside board of decoration.
The floor system is composed of house beam, structure board and ceiling.
Ceiling use the gradient roof that widely utilized in light steel board villa,
which is composed by gradient truss,structure board, waterproofing layer, heat preservation layer and decoration board.
1.How about the installation? For example, the time and cost?
To install 200sqm house needs only 45 days by 6 professional workers. The salary of enginner is USD150/day, and for workers, it's 100/day.
2.How long is the life span of the house?
Around 50 years
3. And what about the loading quantity?
One 40'container can load 140sqm of house.
Inside decorations of two-storey steel frame building: