Loading Port:Tianjin
Payment Terms:TT OR LC
Min Order Qty:100 m²
Supply Capability:10000 m²/month
Easy to assemble and dismantle
Easy installation and long lifespan
Elegant, Eco-friendly
First-class before and after service
Enriomental Protection /Modern Latest Luxury Prefab Light Steel Villa Sold to South Africa
Package of prefab Light Steel Villa
Characteristics and specifications Prefab Light Steel Villa
Galvanized steel or powder coated steel as the major part of structure which is firm and durable, it has quite good capacity to resist corruption.
The main material of the wall, roof is light and strong. It is produced by injected EPS, PU or rook wool between 2 steel sheets. They have quite good capacity of water proof, moisture proof and heat resistance.
The light steel structure with the good quality sandwich panel could resist different weather, such as typhoon, heavy rain and earthquake.
Almost dry construction, the assemble of steel villa do not need much water, which is more environmental friendly than building the concrete building. It adapts to the eco trend.
Water pipe and wires could be fixed into and be hidden into the sandwich panel which is good looking.
Good to design and decorate. The floor and wall could be decorated by different material according to the user’s idea.
Wide-range in application, it can be widely applied in Villa, vacation village, low-rise residence, hotel, Civil or Commercial Building. And average using cost is less than other kinds of building annually.
FAQ
1. Q: How much is this house?
A: Please provide with your house drawing and project location, because different design, different location effect the house materials quantity and steel structure program.
2. Q: Do you do the turnkey project?
A: Sorry, we suggest customer to deal with the foundation and installation works by self, because local conditions and project details are well knowb by customers, not us. We can send the engineer to help.
3. Q: How long will your house stay for use?
A: Our light steel prefab house can be used for about 70 years.
4. Q: How long is the erection time of one house?
A: for example one set of 200sqm house, 8 workers will install it within 45 days.
5. Q: Can you do the electricity,plumbing and heater?
A:The local site works had better to be done by the customers.