Loading Port:Guangzhou
Payment Terms:TT OR LC
Min Order Qty:50 m²
Supply Capability:10000 m²/month
Metal frame prefab house for anti-earthquake quick installation
Feature :
1). Prefabrication, easy application
2). New type of residential construction technology with colorful appearance
3). Multi appearance on option, grace and well-done
4). High strength and stiffness, high weight bearing
5). Waterproof and sound insulation
House main structure show
Projects oversea
Metal frame prefab house for anti-earthquake quick installation
You may give us your drawings to enable us construct as per your request or you might just give us your ideas, we can design the project based on your ideas. Welcome to visit the factory .
The wall plate we use the prefab concrete plate, it's modle design and beautiful appearance, more longer service life and high earthquake resistance. decorate with tile will must be much better.single colorfull corrugated steel sheet,sandwich panel with EPS, ROCK WOOL , PU etc insulation
The main frame (columns and beams) is made of welded H-style steel or hot rolled steel H section. steel materials: Q234 Q345 Q420.The columns are connected with the foundation by pre-embedding anchor bolt and beams and columns, beams and beams are connected with high strength bolts.cement and steel foundation anchor bolts.
Surface Treatment: Rust-proof Painting with 2-4 Layers
FAQ
1. Q: How much is this house?
A: Please provide with your house drawing and project location, because different design, different location effect the house materials quantity and steel structure program.
2. Q: Do you do the turnkey project?
A: Sorry, we suggest customer to deal with the foundation and installation works by self, because local conditions and project details are well knowb by customers, not us. We can send the engineer to help.
3. Q: How long will your house stay for use?
A: Our light steel prefab house can be used for about 70 years.
4. Q: How long is the erection time of one house?
A: for example one set of 200sqm house, 8 workers will install it within 45 days.
5. Q: Can you do the electricity,plumbing and heater?
A:The local site works had better to be done by the customers.