Light Steel Prefab Villa House Elegant Style

Loading Port:China main port

Payment Terms:TT OR LC

Min Order Qty:50 m²

Supply Capability:10000 m²/month

Product Description:

1.Description of light steel structure villa:
1.Light steel structure villa provide larger space for sharing and enhance function distribution that it  can be flexibly separated according to specific needs.

2. It can be built on hilly places, in forests and on frozen earth

3. It only as much 1/4 of concrete structure, which can greatly reduces the cost in initial phase.

4. The construction is very quick, about 1/3 than traditional ones. All components are produced in the factory and install on site.

5. More safer. It is known that light steel structure villa has at least two times shock resistance as much as those of ordinary structure and it can resist 70m/s hurricane.

2.Feature of light steel structure villa:
1. Main steel frame: galvanized steel or powder coated steel work, firm and durable.
2. Main material of the wall & roof: EPS, PU or Rock Wool with 0.5mm color steel, light and strong, water proof, moisture proof and heat resistance.
3. The house can resist different weather, such as typhoon, heavy rain and earthquake.
4.Almost dry construction, the assemble of light steel villa do not need much water, which is more environmental friendly than building the concrete building. More fit to the eco trend.
5.Water pipe and wires can be fixed and hidden into the sandwich panel which is nice looking.
6. Different design and decoration. The floor and wall can be decorated by different material according to the customer‘s demand.
7.Wide-range in application, it can be widely used as Villa, vacation village, low-rise residence, hotel, Civil or Commercial Building.
3.Light steel structure villa Images:

Light  Steel Prefab Villa House Elegant Style

Light  Steel Prefab Villa House Elegant Style

4.Specifications of the light steel structure villa:

                          Light steel structure villa specification

Key Features

Item Title

Materials Description

House body

Main structure

Light Steel Structure, steel column, Structure board

Exterior wall decoration

90 steel stud, glass wool, 10mm calcium silicate board, moisture-proof film, 19*50 steel stud, fiber cement board, exterior wall water-proof

Roof/Cornice

Roof: Single-layer bituminized tiles, 3mm SBS water-proof rolling material, 15mm OSB board
Cornice:75mm steel stud, calcium silicate board, putty paint

Rain carrying system

PVC rain carrying system

Doors and windows

Security door, paint-free door, glass door, plastic steel window, artificial marble

Finishing

Interior wall decoration

Ceiling grid, second floor 75*2 glass wool, first floor 75mm glass wool, waterproof moisture-proof membrane, 9.5mm plaster board, putty paint

Interior ceiling

Fire proof gypsum board, putty and paint

Water and electricity pipes

Water supply PPR pipe, drainage PVC pipe
Switch socket panel, lamp

Indoor ground

Floor and accessories, kitchen and washing room tile

Other materials

Closet, washing basin, sink, shower

Installation

To install 200m2 house needs only 45 days by 6 professional workers

Loading quantity

One 40' container can load 140 m2

Wind load

130km/h

Anti-seismic grade

9 degree

Life span

Around 70 years

Remarks

This specification is for the reference, if there are differences between actual condition, the adjusting is according to the actual condition.

5.FAQ
1.Q: How much is this house?
   A: Please provide with your house drawing and project location, because different design, different location effect the house materials quantity and steel structure program.
2.Q: Do you do the turnkey project?
   A: Sorry, we suggest customer to deal with the foundation and installation works by self, because local conditions and project details are well knowb by customers, not us. We can send the engineer to help.
3.Q: How long will your house stay for use?
   A: Our light steel prefab house can be used for about 70 years.
4.Q: How long is the erection time of one house?
   A: for example one set of 200sqm house, 8 workers will install it within 45 days.
5.Q: Can you do the electricity,plumbing and heater?
   A:The local site works had better to be done by the customers.