Loading Port:Qingdao
Payment Terms:TT OR LC
Min Order Qty:30000 g/m²
Supply Capability:600000 g/m²/month
Structure of Warp Knitted Polyester Geogrid Description:
Polyester geogrd applies chemical fiber with extreme strong elasticity modulus,make it into grid loom stare through oriented warp knitting ,then ater coating the geogrid is formed with the name of "fiber soft steel".
Main Features of Warp Knitted Polyester Geogrid:
Polyester geogrid has high tensile strength and high tear-resisitant
Compared with the traditional road surface, it reduces the cost, prolong the service life, and avoid the reflection road crackle.
Polyester geogrid is also used to strengthen the soft land, such as railway, airport, irrigation work, and dyke, etc, and the roadbed
Warp Knitted Polyester Geogrid Images
Warp Knitted Polyester Geogrid Specification:
Item | Art.No. | PLB010101 | PLB010102 | PLB010103 | PLB010104 | PLB010105 |
Specs | TGDG25 | TGDG35 | TGDG50 | TGDG80 | TGDG110 | |
Unit weight,g/m2 | 370±50 | 450±50 | 550±50 | 700±50 | 1100±50 | |
Width,m | 1.0+0.2/-0 or 2.0+0.2/-0 | |||||
Tensile strength, kN/m≥ | 25 | 35 | 50 | 80 | 110 | |
Elongation,%≤ | 10 | |||||
Tensile strength at 2% strain,kN/m≥ | 7 | 10 | 12 | 26 | 32 | |
Tensile strength at 5% strain,kN/m≥ | 14 | 20 | 28 | 48 | 64 | |
Roll length,m | 50+0.25/-0 |
FAQ
We have organized several common questions for our clients,may help you sincerely:
Q1: How about your company?
A1:Our company are one of the largest geosynthetic products supplier in the world.We have the products experience more than 20 years.Already export to USA/Germeny/Australia/Zambia/Brazil etc.more than 20 countries.Almost 10years.Our products including Geocell/Fiberglass Geogrid/Geomembrane/Geotextile/Geonet etc.
Q2.Does your products have good qualitity?
A2:Yes,we have do many big projects such as the 2008 Beijing Olympic BIRD NEST. Divert water from the south to the north project. And our products have CE certificate also.
Q3:How long can we receive the products after purchase?
A3:In the purchase of product within three working days, We will arrange the factory delivery as soon as possible. The pecific time of receiving is related to the state and position of customers.Commonly 15-20 working days can be delivery.