Loading Port:Tianjin
Payment Terms:TT OR LC
Min Order Qty:20000 pc
Supply Capability:300000 pc/month
1. Introduction of Cup-lock Scaffolding:
Q235 steel cuplock scaffolding product type Q235 steel cuplock scaffolding tube diaeter 48mm tube thickness 3.0/3.25mm vertical tube length 600/1200/1800/2400, or OEM horizontal tube length 600/900/1200/1800, or OEM surface treatment painted, hot dip galvanized material steel material grade Q195, Q235,Q345.Hire option given in selected regions.Hot selling Cup-lock Scaffolding with low price.The application of large areas formwork has greatly increased the construction efficiency and reduced the cost.
2. Main Features of Cup-lock Scaffolding:
Model No: Scaffolding
Item No: Cup-lock Scaffolding
Finished:Hot Dip Galvanized/Electroplate/Powder Coated
Produce Technology:Welding by robot
Certificate:SGS/EN12810
Delivery Time:30-35 Days After Confirmation
3. Cup-lock Scaffolding Images:
4. Cup-lock Scaffolding Specification:
Q235 Steel Cup-Lock Scaffolding
Features:Welding by Robot
Surface:HDG,Galvanized,etc
Packaging Details:Cuplock Scaffolding Packing:
1) Normally scaffolding is loaded to containers in bulk in order to load as more as possible and save sea freight
2) If customer want to unload by forklift in order to save the labor cost, then we will pack the scaffolding in steel pallet or steel case
3) Other special requirements can be discussed by both
5. FAQ of Cup-lock Scaffolding :
1)How to guarantee the quality of the products?
1. Cuplock scaffolding system life span could be 8 years if choosing hot dip galvanized as surface finishment, dip painting could be 4-6 years.
2. Cuplock scaffolding system is a tradtional system, safe and heavy duty. Comparing with other scaffolding systems, it is more suitable for heavy construction,such as bridge.
3. Mutifunction : Construction project, working platform, shipyard, bridge…