Loading Port:China main port
Payment Terms:TT OR LC
Min Order Qty:3000 pc
Supply Capability:300000 pc/month
1,Brief Introduction of PP Geo Textile Bag
Geotextile bags that component is PP or PET needle punched non woven fabric
It is a greener environmental protection solutions used for erosion control ,embankment/slope protection and shoreline stabilization, stormwater management, and the creation of rain gardens and other functional green spaces.
2,Feature of PP Geo Textile Bag
Strong corrosion resistance ,UV resistance, anti-aging, non-toxic, non-combustion,good stability,split not extend etc. features.Anti-rot,anti-degradation,pests erosion resistance.
3,Package of PP Geo Textile Bag
Stardard export package or as per your request
4,Application of PP Geo Textile Bag
1).Ecohydraulic Engineering:
Natural environment for both sides of the ecological river, soil and water conservation,reservoir fluctuation zone regreening, wetland project, coastal engineering etc.
2.)Highway Engineering:
Roadbed side slope,retaining wall project, massif excavate side slope,bridgepier slope protection,culvert exits and entrances "Eight word" wall,sound protective screen, ecological isolation strip,swelled ground side slope,freeze thawing district side slope etc.
3).Railway Engineering:
Roadbed side slope,retaining wall project, massif excavate side slope,bridgepier slope protection,culvert exits and entrances "Eight word" wall,ecological beauty spot ecological district side slope,ecological fragile district ecological side slope etc.
5.FAQ
We have organized several common questions for our clients,may help you sincerely:
1>How about your company?
A manufacturer & supplier focuses on the production of geo textile and geo bag etc. We have exported this product to Amereica, Europe and South East Asia. Customized product is also available based on your detailed requirements.
2> What's the MOQ ?
We kindly recommend 1x40'HQ as the price would be economical based on large loading quantity.
3>How long can we receive the product after purchase?
It takes about 1 to 2 weeks to finish the production based on the specific production schedual. Then it will depend on the shipping time from loading port to the destination port.