ID 15 Scaffolding System in Hot Dip Galvanizing

Loading Port:Tianjin

Payment Terms:TT OR LC

Min Order Qty:1000 kg

Supply Capability:1000 kg/month

Product Description:

1.Structure of ID 15 Scaffolding Description:

ID 15 Scaffolding is designed for supporting the formwork system in construction, Can be used to be tower, and widely used in bridge project.it is popular in UAE.

Scaffolding ID15 which is consists of base head, frame 133 frame 100,end frame,diagonal.

A complete set of tower scaffolding usually include 2 pieces of H frames, 2 pairs of cross braces and 4 joint pins. 

 

2.ID 15 Scaffolding advantages:

ID 15 Scaffolding adapts flexible to any wall geometry

Fast due to pre-assembled panels with built-in plywood

Strong with 80 KN fresh concrete pressure per m2 allowed

Economical due to longer service life and fewer parts

Hire option given in selected regions

Hot selling ID 15 Scaffolding with low price

It's easy to erect and fit in your work compared with conventional method, saving you 20% working time.

 

Packaging & Delivery

Packaging Details:

Iron packed

Delivery Detail:

upon receipt of 30% of deposite after confirmed the order

 

3.ID 15 Scaffolding Products pictures:

ID 15  Scaffolding System in Hot Dip Galvanizing 

4.ID 15 Scaffolding  Specification:

 ID 15  Scaffolding System in Hot Dip Galvanizing

 5.FAQ

 We have organized several common questions for our clients,may help you sincerely:

1)How many Scaffolding your company have?

Here comes our 5 types of Scaffolding systems:

- Cup lock Scaffolding(C-Lock Scaffolding)

- Ring lock Scaffolding

-Kwistage Scaffolding

-H-frame Scaffolding

-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.

2)How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.