Hot-Dip Galvanized Steel Coils Best Quality-ASTM A653

Loading Port:China main port

Payment Terms:TT OR LC

Min Order Qty:50 m.t.

Supply Capability:10000 m.t./month

Product Description:

Hot-Dip Galvanized Steel Coils Best Quality-ASTM A653

 

1.Structure of Hot-Dip Galvanized Steel -ASTM A653Description

Hot-dip galvanized steel coils are available with a pure zinc coating through the hot-dip galvanizing process. It offers the economy, strength and formability of steel combined with the corrosion resistance of zinc. The hot-dip process is the process by which steel gets coated in layers of zinc to protect against rust. It is especially useful for countless outdoor and industrial applications. Production of cold formed corrugated sheets and profiles for roofing, cladding, decking, tiles, sandwich walls, air conditioning duct.

2.Main Features of the Hot-Dip Galvanized Steel -ASTM A653

• Excellent process capability

• Smooth and flat surface

• Workability, durability

• Excellent anticorrosive property

• High strength

• Good visual effect

3.Hot-Dip Galvanized Steel ASTM A653Sheet Images

 

Hot-Dip Galvanized Steel Coils Best Quality-ASTM A653

Hot-Dip Galvanized Steel Coils Best Quality-ASTM A653

 

4.Hot-Dip Galvanized Steel Sheet  Specification

Standard: ASTM, JIS,EN

Grade: CS, DX51D+Z,SGCC, SS 230~550,S220GD+Z~S550GD+Z, SGC340~SGC570

Thickness: 0.18mm~5mm

Width: max 2000mm

Coil weight:3-12 MT

Coil ID:508/610mm

Surface structure: zero spangle, regular spangle or minimum spangle

Surface treatment: Chromate treatment, Oiled/dry, skinpassed/non-skinpassed

 

5.FAQ of Hot-Dip Galvanized Steel Sheet

We have organized several common questions for our clients,may help you sincerely:

1.How to guarantee the quality of the products?

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. 2. How long can we receive the product after purchase?

Usually within thirty working days after receiving buyer’s advance payment or LC. We will arrange the factory manufacturing as soon as possible. The cargo readiness usually takes 15-30 days, but the shipment will depend on the vessel situation.