High quality IPEAA

Loading Port:China Main Port

Payment Terms:TT OR LC

Min Order Qty:-

Supply Capability:-

Product Description:

Product Description:

IPEAA Beam Details:

Minimum Order Quantity:10MTUnit:m.t.Loading Port:Tianjin Port, China
Supply Ability:10000MTPayment Terms:TT or LC

Product Description:

Specifications of IPEAA Beam

1. Invoicing on theoretical weight or actual weight as customer request

2. Standard: EN10025, GB Standard, ASTM

3. Grade: Q235B, Q345B, SS400, ASTM A36, S235JR, S275JR

4. Length: 5.8M, 6M, 9M, 12M as following table

5. Sizes: 80mm-270mm

Dimensions(mm)

h

b

s

t

Mass  Kg/m

IPEAA80

80

46

3.80

5.20

6.00

IPEAA100

100

55

4.10

5.70

8.10

IPEAA120

120

64

4.80

6.30

10.40

IPEAA140

140

73

4.70

6.90

12.90

IPEAA160

160

82

5.00

7.40

15.80

IPEAA180

180

91

5.30

8.00

18.80

IPEAA200

200

100

5.60

8.50

22.40

IPEAA220

220

110

5.90

9.20

26.20

IPEAA240

240

120

6.20

9.80

30.70

IPEAA270

270

135

6.60

10.20

36.10

Appications of IPEAA Beam

1. Supporting members, most commonly in the house raising industry to strengthen timber bears under houses. Transmission line towers, etc

2. Prefabricated structure

3. Medium scale bridges

4. It is widely used in various building structures and engineering structures such as roof beams, bridges, transmission towers, hoisting machinery and transport machinery, ships, industrial furnaces, reaction tower, container frame and warehouse etc.

Package & Delivery of IPEAA Beam

1. Packing: it is nude packed in bundles by steel wire rod

2. Bundle weight: not more than 3.5MT for bulk vessel; less than 3 MT for container load

3. Marks: Color marking: There will be color marking on both end of the bundle for the cargo delivered by bulk vessel. That makes it easily to distinguish at the destination port.

4. Tag mark: there will be tag mark tied up on the bundles. The information usually including supplier logo and name, product name, made in China, shipping marks and other information request by the customer.

If loading by container the marking is not needed, but we will prepare it as customer request.

5. Transportation: the goods are delivered by truck from mill to loading port, the maximum quantity can be loaded is around 40MTs by each truck. If the order quantity cannot reach the full truck loaded, the transportation cost per ton will be little higher than full load.

6. Delivery of IPE Beam: 30 days after getting L/C Original at sight or T/T in advance

Production flow of IPEAA Beam

Material prepare (billet) —heat up—rough rolling—precision rolling—cooling—packing—storage and transportation