1.Quick Details
Model Number: FAS-TEF
Material: Steel/Aluminium
Surface: Paint/ galvanized
Certification: CE
Loading Port:Qingdao
Payment Terms:TT OR LC
Min Order Qty:20 m.t
Supply Capability:3000 m.t/month
1.Quick Details
Model Number: FAS-TEF
Material: Steel/Aluminium
Surface: Paint/ galvanized
Certification: CE
2.Model No: FAS-TEF
Model Name: Facade Scaffolding System-Top End Frame
3.Features:
1. Made of high strength steel tube
2. Size:Top Frame: 1000mm(H)x732mm(W)
3. Surface finish: painted/electro (hot dipped) galvanized or to be order
4. Also can manufacture it as your requirement.
4.
Model | Description | Weight(kg) | Weight(lbs) |
AR.COL.280 | Ring Lock Collar 280mm | 1.81 | 3.98 |
AR.COL.235 | Ring Lock Collar 235mm | 1.52 | 3.35 |
AR.CJ | Ring Lock Caster Jack | 3.51 | 7.74 |
AR.SA | Ring Lock Spigot Adaptor | 1.62 | 3.58 |
5.What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator