Facade Scaffolding Steel System-top end frame CNBM

Loading Port:Qingdao

Payment Terms:TT OR LC

Min Order Qty:20 m.t

Supply Capability:3000 m.t/month

Product Description:

1.Quick Details

  • Model Number: FAS-TEF

  • Material: Steel/Aluminium

  • Surface: Paint/ galvanized

  • Certification: CE

2.Model No: FAS-TEF

Model Name: Facade Scaffolding System-Top End Frame

3.Features:

1. Made of high strength steel tube
2. Size:
Top Frame: 1000mm(H)x732mm(W)

3. Surface finish: painted/electro (hot dipped) galvanized or to be order

4. Also can manufacture it as your requirement.

4.

Model

Description

Weight(kg)

Weight(lbs)

AR.COL.280

Ring Lock Collar 280mm

1.81

3.98

AR.COL.235

Ring Lock Collar 235mm

1.52

3.35

AR.CJ

Ring Lock Caster Jack

3.51

7.74

AR.SA

Ring Lock Spigot Adaptor

1.62

3.58

5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Facade Scaffolding Steel System-top end frame CNBM