Plastic Tubes 2024 China PPR Three Tee for Industrial Field Irrigation System

Loading Port:Tianjin

Payment Terms:TT OR LC

Min Order Qty:1000 pc

Supply Capability:10000000 pc/month

Product Description:

Product Overview

The comprehensive technical performance and economic indicator of PP-R are much better than galvanized pipe, UPVC pipe, polyethylene-aluminum compound pipe, PE-X (cross-linked polyethylene) and polybutylene pipe etc. For this reason PP-R is the leading products and widely used for feed-water piping in developed countries in Europe and America.

Nowadays PPR pipes win more attention and have been used all over the whole world more widely with its excellent sanitization performance, high heat resistance, compression resistance, corrosion resistance, pliability and seismic performance which make PP-R the real environmental friendly pipe.


Advantages

Large drum hub to maximize cable life

Self-activating automatic brake hold the load securely when crank handle is released

With cable or strap

Safety guard cover available

Top quality with competitive price

Widely used in the double beam bridge crane and gantry crane

Easy to install and high quality

Compact structure and reasonable design


Product Description

Product name

Size

Weight

Pack

 

 

 

 

 

 

 

Equal tee


(Gram/m)

(m/pack)

T16

12.5

1300

T20

19.4

800

T25

30.5

450

T32

48.2

260

T40

90.8

150

T50

142.5

106

T63

275.3

54

T75

515.0

30

T90

712.0

18

T110

1082.0

12

T125

1544.0

8

T160

2531.0

4


Product Show

2019 China PPR Three Tee used in Industrial Field Irrigation system

2019 China PPR Three Tee used in Industrial Field Irrigation system

2019 China PPR Three Tee used in Industrial Field Irrigation system


FAQ

Q1: How Can I Get A Sample?

A1: You can get samples by communicate with our export sales.

Q2: How Long Is Delivery?

A2: Delivery time will be30-45days according to order quantity.

Q3: What Is The MOQ?

A3: MOQ depends on different items.

Q4: What Is Our Normal Payments Terms?

A4: Our normal payment terms now is: T/T, L/C or western union, pay