YHX Single Layer Suspended platform

Loading Port:Guangzhou

Payment Terms:TT OR LC

Min Order Qty:-

Supply Capability:99 unit/month

Product Description:

Guangdong Yuhuaxing Construction Machinery Manufacture Co., Ltd., established in March 1997, is a private enterprise specializing in R&D, designing, manufacturing, selling and leasing of construction machinery. Headquartered in Baiyun District of Guangzhou, it is the council unit of Decoration and Aerial Work Machinery Branch of China Engineering Machinery Industry Association and a member of Guangdong Standardization Association, mainly producing builder hoist, mast climbing work platform, superdeck loading platform, temporary suspended platform, building maintenance unit etc.

ZLT250 Single Layer Suspended platform for Elevator Installation

Description of ZLT250 Single Layer Suspended platform for Elevator Installation

It is a kind of special suspended access equipment powered by advanced motor systems. Such kind of temporary access platform is particularly designed for installing and repairing elevators of high buildings.

Key Features of ZLT250 Single Layer Suspended platform for Elevator Installation

-easy to handle

-safety devices installed

-no need to install extra scaffolding

-excellent working efficiency

- manufactured to the latest GB19155-2003 National Safety Standard

- minimal space is required for transportation and storage

- relatively low self-weight

Main Technical Parameters of ZLT250 Single Layer Suspended platform for Elevator Installation

Item Parameters

Rated working load 250kg(551 lb)

Descending and ascending speed 8-10m/min

Platform dimensions (width)*(depth) *(height) (mm) 1360×1360×3700

Steel wire model Specially made wireφ8.6

HoistRated lift capacity 7.84KN

Motor model YEJ100L-4

Power 2.2KW

Voltage 380V

rotate speed 1420rpm

break torque 15Nm

Safety lock Wallop permitted 30KN

Tilt angle permitted 3°-8°

Dead weight About 250kg(551 lb)

Overall weight About 250kg

Distance between main tracks(mm) L11700mm

Width of the lifting machine room(mm) L2=2200-2400mm

Distance between the lifting top points and the floor L3=1210mm