wholesale Astm 316 /316L Stainless Steel Round Bar

Loading Port:Tianjin

Payment Terms:TT or LC

Min Order Qty:24 m.t.

Supply Capability:25000 m.t./month

Product Description:

Specifications

Stainless Steel Bar
1.Cold roll cold draw pipe&tube
2.Grade: TP304,TP316L
3.Honor: CE/PED,AB
4.STANDARD: ASTM 312/213/269

 

 

Description:

SeriesTop Quility steel Rod
 Grade 300 series(304, 304 L,304H,310,310S,316, 316 L,317L,321etc.)
 Technics Hot-rolled, Hot-forged, Cold-drawn, Centerless Gringing
 Surface Peeled, Bright, Polish
 Diamete Rang   Peeled bright round bar: 3-400mm
 Hot-rolled bar: 3-130mm 
 Hot- forged bar: 130-400mm 
 Cold-drawn: 3-40mm 
 Centerless grinding bright round bar: 3-100mm 
 Dia torlarance:H9-K12
 Length Radom length, Specified length, Multiple length ( no more than 9m)
 Usage These products are widely supplied to areas of machine-made  industry, chemical  industry, 
shipping industry, rchitecture, food industry, household products etc
  Packaging Standard export packing, according to customer's requirment
 Delivery Timeup to the order quantity
 CertificationCE/PED,ABS, DNV ,GL,LR 
ApplicationPipe and Tubes for petrochemical industry,pharmaceutical industry ,food industry,
aviation and aerospace industry,architectural decoration industry

 

FAQ:

Q1: Why buy Materials & Equipment from OKorder.com?

A1: All products offered byOKorder.com are carefully selected from China's most reliable manufacturing enterprises. Through its ISO certifications, OKorder.com adheres to the highest standards and a commitment to supply chain safety and customer satisfaction.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 7 to 10 workdays.