Wedge Pin Scaffolding System with Cheapest Price CNBM

Loading Port:Qingdao

Payment Terms:TT OR LC

Min Order Qty:20 m.t.

Supply Capability:3000 m.t./month

Product Description:

1.Quick Details

  • Model Number: XMWY-0001

  • Material: Q235/Q345

  • Component: Standard, Base Collar, Ledger, Diagonal

  • Technology: Automatic Welding, Punching, Casting

  • surface treatment: electrophoretic painting / galvanized

  • Installation: easy & quick

  • Quality: European Standard

  • Height: adjustable

  • Reused: at least 6 years

  • Certification: ISO 9001,ISO18001,ISO14001

  • Market: worldwide

2.Packaging & Delivery

Packaging Details:

Delivery Detail:

steel bracket / suitable for shipment

15-20 days

Wedge Pin Scaffolding System with Cheapest Price CNBM

Components: Ring-Lock Standard With Spigot, Ring-Lock Ledger, Ring-Lock Diagonal, Wedge Pin, Base Collar, Steel Plank, Steel Stair Case.

3.Feature:

1.Quick erection with one-man assembly

2.Safe and simple structure

3.Economic and versatile design

4.Widely used in construction

5.No loose parts

6.Maintenance free      

4.Product details: 


               XM Ring Lock scaffolding system

Scaffolding parts

Specification(mm)


Load capacity

(KN)/sqm

Vertical/standard

1000*48.3*3.2


40.75

1500*48.3*3.2


34.35

2000*48.3*3.2


29.75

2500*48.3*3.2


26.85

3000*48.5*3.2


24.75

Ledger/horizontal

600*48.3*3.2


50.15

900*48.3*3.2


48.35

1200*48.3*3.2


46.55

1800*48.3*3.2


44.95

2000*48.3*3.2


44.55

2500*48.3*3.2


30.25

3000*48.3*3.2


28.65

Diagonal brace

2000*1200*48*2.5


43.65

2000*1800*48*2.5


42.35

2000*2000*48*2.5


41.25

2000*2500*48*2.5


39.55

2000*3000*48*2.5


36.75

Base collar

280*48.3/60*3.2


51.23

5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator