Wear Sleeve PM II Concrete Pump Parts High Quality

Loading Port:Shanghai

Payment Terms:TT OR LC

Min Order Qty:1 pc

Supply Capability:1000 pc/month

Product Description:

Product information:

Wear Sleeve is the basic material among the frictional materials

They are widely used as the basic components for sealing

And the Wear Sleeve are widely adopted in petrochemical 

industry due to its excellent performances such as wear ability, anti corrosion

Wear Sleeve is widely known for its durability and quality

It can withstand high pressure and is resistant to corrosion, so is used in water pumps, oil pumps and various other pumps

Today, Wear Sleeve has been playing an important role in the field of long working parts material

Applications:

Wear Sleeve is often used in concrete pumps.

Main Product Features:

·    Premium quality

·    Prompt delivery & seaworthy packing (5-10 days)

Reliable performance

Easy to weld

High safety.

·    Professional Service

·    Competitive pricing

   Measuring of wall thickness from the outside

   Low purchase cost

   Measuring of wall thickness from the outside

   Low purchase cost

About our service:

OEM and ODM orders are welcome

Customized design is available

Reply your enquiry in 24 working hours

Experienced staffs will answer to all your questions in fluent English

Payment terms: we accept T/T, L/C, PayPal, Western Union, Escrow

FAQ:

Q1: How long about delivery time?

A1: Normally we keep the raw materials for old customers and sometime we also keep stock products to make sure delivery time in any emergency cases.

Q2: How do we guarantee the quality of our pipes?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will book the vessel for goods. The specific shipping date is dependent upon international and government factors, but is typically 7 to 30 workdays.

Q4: If we can produce some pipes according to customers request?

A4: Yes, we can produce Concrete Placing Boom according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Wear Sleeve PM II Concrete Pump Parts  High Quality


Wear Sleeve PM II Concrete Pump Parts  High Quality