Villa House Prefabricated Home Standard High Quality Prefab Home

Loading Port:Shanghai

Payment Terms:TT OR LC

Min Order Qty:50 m²

Supply Capability:10000 m²/month

Product Description:

Villa House Prefabricated Home Standard High Quality Prefab Home


Why Choose Light Gauge Steel Structure?

1)Lifetime for structure: 100 years.[0.75~1.2mm , Z275galvanized steel profile, strength:550Mpa ]

2)Earthquake resistance: mix more than 8 grades.

3)Wind resistance:max 60m/s.

4)Fire resistance:all the materials used can be fire resistance.

5)Snow resistance:max 2.9KN/m²as required

6)Heat insulation:100 mm in thickness can match 1 m thickness of brick wall.

7)High acoustic insulation:60db of exterior wall 40db of interior wall

8)Insect prevention: Free from the damages by insects, such as white ants

9)Ventilation:a combination of natural ventilation or air supply keep the indoor air fresh and clean

10)Packing and delivery: 140SQM/ 40'HQ container for structure only and 90SQM/ 40'HQ container for structure with decorate materials.

11)Installation:the average is one worker one day install one SQM.

12)Installation guide:dispatch engineer to guide on site. 


Design code: 

(1)AISI S100 North American Specification for the Design of Cold Formed Steel Structural Members published by the American Iron and Steel Institute (AISI) in the United States.

 

(2)AS/NZS 4600 Australian/New Zealand Standard-Cold-formed steel structures jointly published by Standards Australia and Standards New Zealand.

 

(3)BS 5950-5 Structural use of steelwork in building-Part 5. Code of practice for design of cold formed thin gauge sections published by BSI in the UK.

 

(4)ENV1993-1-3 means Eurocode 3: Design of steel structures; Part 1.3: General rules, Supplementary rules for cold-formed thin gauge members.


Specifications

Flat roof prefab house construction 
Low cost, durable structure, convenient relocation, esty to assemble and disassemble
 

Description

 

Structure is reliable: Light steel structure system is safe and reliable, satisfied modern architecture concept.

 

Easy assembly and disassembly: The house can be assembled and disassembled many times, used repeatedly.

It just need simple tools to assemble. Each worker can assemble 20~30 square meters every day. 6 worker can finish 300sqm prefab house in 2 days.

 

Beautiful decoration: The prefab house is beautiful and grace, have bright and bland colour, flat and neat board, with good decoration effect.

 

Flexible layout: Door and window can be assembled in any position, partition wall panel can be assemble in any transverse axes sites. Stair is assembled in outside.

 

Using life: All the light steel structures have antisepsis-spraying treatment. The normal using age are above 15 years.

 

Environmental protection and economy: Prefab house design is reasonable, easy to assemble and disassemble, used circularly, low wastage, without building rubbish. Average using cost is less than other kinds of building annually.


Features

 

1) Environmental Benefits 

2) Benefits in Construction

Efficient use of architectural area - 8-10% improved
space usage

Anti-earth quake - soft and light structure reduce the
influence of earthquake

Anti-wind - strong structure

Light self-weight - lighter than 1/4 - 1/6 of traditional
reinforced concrete structure

Builds up to 4-6 floors

Extended choice of external decorative finishes 


FAQ

1.    Q: How much is this house?

A: Please provide with your house drawing and project location, because different design, different location effect the house materials quantity and steel structure program.

2.    Q: Do you do the turnkey project?

A: Sorry, we suggest customer to deal with the foundation and installation works by self, because local conditions and project details are well knowb by customers, not us. We can send the engineer to help.

3.    Q: How long will your house stay for use?

A: Our light steel prefab house can be used for about 70 years.

4.    Q: How long is the erection time of one house?

A: for example one set of 200sqm house, 8 workers will install it within 45 days.

5.    Q: Can you do the electricity,plumbing and heater?

Villa House Prefabricated Home Standard High Quality Prefab Home

Villa House Prefabricated Home Standard High Quality Prefab Home

Villa House Prefabricated Home Standard High Quality Prefab Home

Villa House Prefabricated Home Standard High Quality Prefab Home