Vertical Structure Support System for Push Pull Prop

Loading Port:Tianjin

Payment Terms:TT OR LC

Min Order Qty:200 m

Supply Capability:50000 m/month

Product Description:

1. Structure of Push Pull Prop

Pull-push prop are used for supporting the wall and column formwork.

 

1.) For Timber Beam Formwork

Vertical Structure Support System for Push Pull Prop

 

2.) For Steel Frame Formwork

Vertical Structure Support System for Push Pull Prop 

 

2. Main Features of Push Pull Prop

High degree of standardization

Simple site operations

Quick adjustment

 

3. Push Pull Prop Images

Vertical Structure Support System for Push Pull Prop

 

Vertical Structure Support System for Push Pull Prop

 

 4. Single Side Bracket Specifications

There are three kinds of pull-push props, A,B,C. The A and B is suitable for the formwork not higher than 3000mm; C is suitable for the formwork higher than 3000mm as a reinforcer.

Vertical Structure Support System for Push Pull Prop

 

5. FAQ of Single Side Bracket

 

1) What can we do for you? 

    .We can ensure the quality of the push pull prop and avoid extra expenses for customers.

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects.        

 

2) What promises can be done by us?

   . please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issues.

 

3) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.

 

 4) What about the package and shipping time?

    .Packing: wood package and adhesive tape

    .Shipping: by sea

     Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks.