Up-slung launching gantry

Loading Port:China Main Port

Payment Terms:TT OR LC

Min Order Qty:-

Supply Capability:-

Product Description:

Description

1) Double main girder andtwo-span structure, more secure, faster. Applicable to the low pier andclearance under bridge is not demanded. Simple construction, needless todismantle the main girder and outside mould parts;

2) Outside mould system opens and closes transversely,original design and ingenious conception;

3) Transverse movement and hoisting is propelled bythe power, easily and fast;

4) Lifting and opening, closing are controlled by thehydraulic pressure, with steady movement which is secure and reliable. Reducethe labor intensity and upgrade the construction efficiency;

5) All the legs can pass through the whole automaticallyand erect, reducing the investment of auxiliary equipments, reducing theconstruction cost.

Performance and parameters

Applicable longitudinal gradient: 2.0%
Applicable curve radius:
≥1500m
Requirements for environment wind pressure:

Maximum allowable wind pressure during shifting: 150N/

Maximum allowable wind pressure during casting: 800N/㎡ ( or to be anchored)
Total power by using the whole machine:About 95kw
Kinetic condition: 4Ac, 380v, 50Hz
Hydraulic system pressure: 32Mpa
Shift speed: 0-1.5m/min
Deflection of main girder: Less than L/700( only considering the deflectioncaused by the concrete loading and internal mould weight)

Via Hole Stability Factor: k>1.5
Transportation condition: meet the limits of railway and highwaytransportation.
Unit Weight: About 530t (without separated mould situated in the support)
Construction cycle: 10 days/span