Triple Sideshifter T253 double oil passages
Loading Port:Shanghai
Payment Terms:TT OR LC
Min Order Qty:1 pc
Supply Capability:1 pc/month
Product Description:
PRODUCT NAME:Triple Sideshifter T253 |
|
|
PRODUCT INTRO |
|
Forklift should add double oil passagesModel | Capacity | ISO | Install | A | Width of | Width of | C | E | F | S | V | CGH | NW | kg/mm | W1mm | Rank W2mm | mm | frame B1mm | frame B2mm | mm | mm | mm | mm | mm | mm | kg | 2 T 253-L | 1250/600 | ISO 2 | ISO 2 | 75 | 135 | 152 | 35 | 720 | 800-1200 | ±100 | 157 | 83 | 250 | 2 T 253-Q | 1250/600 | ISO 2 | ISO 2 | 75 | 135 | 198 | 35 | 980 | 1000-1400 | ±100 | 157 | 87 | 268 | 3 T 253-L | 1750/600 | ISO 2 | ISO 3 | 85 | 155 | 152 | 35 | 720 | 800-1200 | ±100 | 177 | 88 | 390 | 3 T 253-Q | 1750/600 | ISO 2 | ISO 3 | 85 | 155 | 196 | 35 | 980 | 980-1540 | ±100 | 177 | 91 | 410 | 3 T 253-L/Q | 1750/600 | ISO 2 | ISO 3 | 85 | 155 | 160 | 35 | 800 | 800-1440 | ±100 | 177 | 89 | 398 | 3 T 253-L/Q | 1750/600 | ISO 2 | ISO 3 | 85 | 185 | 160 | 35 | 800 | 800-1900 | ±100 | 177 | 88 | 426 | 4 T 253-L | 2250/600 | ISO 2 | ISO 4 | 135 | 155 | 152 | 35 | 720 | 800-1200 | ±160 | 177 | 78 | 490 | 4 T 253-Q | 2250/600 | ISO 2 | ISO 4 | 135 | 155 | 196 | 35 | 980 | 980-1540 | ±160 | 177 | 78 | 492 | 4 T 253-L/Q | 2250/600 | ISO 2 | ISO 4 | 135 | 155 | 160 | 35 | 800 | 800-1440 | ±160 | 177 | 76 | 480 | 5 T 253-L | 2750/600 | ISO 3 | ISO 4 | 135 | 146 | 152 | 40 | 720 | 800-1200 | ±160 | 191 | 86 | 575 | 5 T 253-Q | 2750/600 | ISO 3 | ISO 4 | 135 | 186 | 196 | 40 | 980 | 980-1480 | ±160 | 191 | 88 | 625 | 6 T 253-L | 2000/1200 | ISO 4 | ISO 4 | 135 | 146 | 152 | 50 | 720 | 800-1200 | ±160 | 201 | 86 | 573 | 6 T 253-Q | 2000/1200 | ISO 4 | ISO 4 | 135 | 186 | 196 | 50 | 980 | 980-1480 | ±160 | 201 | 98 | 690 |
L = Length along pallet length/Q = palle width along direction/L/Q=pallet width or length direction;
1)Solenoid value or purge valve Forklift should add double oil passages Model | Capacity | ISO | Install | A | Width of | Width of | C | E | F | S | V | CGH | NW | kg/mm | W1mm | Rank W2mm | mm | frame B1mm | frame B2mm | mm | mm | mm | mm | mm | mm | kg | 2 T 253-L | 1250/600 | ISO 2 | ISO 2 | 75 | 135 | 152 | 35 | 720 | 800-1200 | ±100 | 157 | 83 | 250 | 2 T 253-Q | 1250/600 | ISO 2 | ISO 2 | 75 | 135 | 198 | 35 | 980 | 1000-1400 | ±100 | 157 | 87 | 268 | 3 T 253-L | 1750/600 | ISO 2 | ISO 3 | 85 | 155 | 152 | 35 | 720 | 800-1200 | ±100 | 177 | 88 | 390 | 3 T 253-Q | 1750/600 | ISO 2 | ISO 3 | 85 | 155 | 196 | 35 | 980 | 980-1540 | ±100 | 177 | 91 | 410 | 3 T 253-L/Q | 1750/600 | ISO 2 | ISO 3 | 85 | 155 | 160 | 35 | 800 | 800-1440 | ±100 | 177 | 89 | 398 | 3 T 253-L/Q | 1750/600 | ISO 2 | ISO 3 | 85 | 185 | 160 | 35 | 800 | 800-1900 | ±100 | 177 | 88 | 426 | 4 T 253-L | 2250/600 | ISO 2 | ISO 4 | 135 | 155 | 152 | 35 | 720 | 800-1200 | ±160 | 177 | 78 | 490 | 4 T 253-Q | 2250/600 | ISO 2 | ISO 4 | 135 | 155 | 196 | 35 | 980 | 980-1540 | ±160 | 177 | 78 | 492 | 4 T 253-L/Q | 2250/600 | ISO 2 | ISO 4 | 135 | 155 | 160 | 35 | 800 | 800-1440 | ±160 | 177 | 76 | 480 | 5 T 253-L | 2750/600 | ISO 3 | ISO 4 | 135 | 146 | 152 | 40 | 720 | 800-1200 | ±160 | 191 | 86 | 575 | 5 T 253-Q | 2750/600 | ISO 3 | ISO 4 | 135 | 186 | 196 | 40 | 980 | 980-1480 | ±160 | 191 | 88 | 625 | 6 T 253-L | 2000/1200 | ISO 4 | ISO 4 | 135 | 146 | 152 | 50 | 720 | 800-1200 | ±160 | 201 | 86 | 573 | 6 T 253-Q | 2000/1200 | ISO 4 | ISO 4 | 135 | 186 | 196 | 50 | 980 | 980-1480 | ±160 | 201 | 98 | 690 |
L = Length along pallet length/Q = palle width along direction/L/Q=pallet width or length direction;
1)Solenoid value or purge valve |
- Similar Products
- New Products