Tower Cranes luffing self-ascending QTZ80(5513)

Loading Port:Qingdao

Payment Terms:TT OR LC

Min Order Qty:1 unit

Supply Capability:1000 unit/month

Product Description:

 QTZ80(5513) Description

Feature: Tower Crane                   Condition: New 

Application: urban construction     Rated Loading Capacity: 1T 

Rated Lifting Moment:400KN.M     Max. Lifting Load: 6T 

Max. Lifting Height:160M               Span: 55M 

Model Number: QTZ80(5513)

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: Orange/ Yellow 

After-sales Service Provided: Overseas third-party support available 

 QTZ80(5513) Features

1.Ten years of experience in supplying new self-erecting tower crane with Taiwo Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

8. Engineers available to service machinery overseas.   

 QTZ80(5513) Specification

Tower Cranes luffing self-ascending QTZ80(5513)

 QTZ80(5513) Pictures

Tower Cranes luffing self-ascending QTZ80(5513)

Tower Cranes luffing self-ascending QTZ80(5513)

Tower Cranes luffing self-ascending QTZ80(5513)



 QTZ80(5513) FAQ

Q: What is the building hoist main purpose?

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal construction equipment for vertical transportation in the field of construction.


Q: What is the function of the monitor?

A: Monitor, namely inspection system (like black box), which could store 10000 tower crane operation reports, and it is recommended to be installed in big cranes more than 16t.


Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.