Timer Beam Formwork H20 with Cost Effective Formwork System in China

Loading Port:Shanghai

Payment Terms:TT OR LC

Min Order Qty:1 m²

Supply Capability:100000 m²/month

Product Description:

1.   Structure of Timber-beam Formwork

       Timber beam wall formwork is used for the concrete pouring of wall. The application of large areas formwork has greatly increased the construction efficiency and reduced the cost. The formwork is made of plywood, timber beam and steel waling. Pull-push props can be designed according to the project or simply select the standard props. Tie-yoke and tie-rod are used to reinforce the corner.


     2.   Main Features of Timber-beam Formwork

   .Standardized production lines

   .Easy transportation and storage

   .Eonvenient for construction 

   .Easy, rapid and economical.

   .Finger jointing of the flange and web, the strength of timer beam is highly improved


3. Timber beam wall formwork Images

    

    4.   Timber-beam Formwork Specification

.Shearing force failure load: 40kg

.Supply capability: 3000m/day, L=6600mm

.Lifespan:4~5 years

.T=18mm&T=21mm

 

5.  FAQ of Timber-beam Formwork

    1) What can we do for you?

    .We can provide you the professional design team.    

    .We can provide fashionable and newest styles for you.    

    .We can design the artwork for you.    

  2) What promises can be done by us?

   . If interested in Timber-beam Formwork, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.

  3) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Timber-beam Formwork cost can be refund after order is confirmed. 

 4) What about the package and shipping time?

    .Packing:  As Customer's Requirements

    .Shipping: We have various shipping ways for our customers

   .Shipping time: Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Timber-beam Formwork, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.