Timer Beam Formwork H20 System for Construction

Loading Port:China main port

Payment Terms:TT OR LC

Min Order Qty:1 m²

Supply Capability:100000 m²/month

Product Description:

1.  Timber-beam Formwork Description 

CMAX Timber beam wall formwork is used for the concrete pouring of wall. The application of large areas formwork has greatly increased the construction efficiency and reduced the cost. The system has two parts, formwork and pull-push props. The formwork is made of plywood, timber beam and steel waling. Pull-push props can be designed according to the project or simply select the standard props. Tie-yoke and tie-rod are used to reinforce the corner.

Timber beam formwork system is convenient for construction and it is easy to control the quality.


2. Main Features of Timber-beam Formwork

- Simple structure, high loading capacity.

- Easy to control the quality

- Excellent surface quality of formed concrete.

- Easy, rapid and economical


3. Timber-beam Formwork Specifications

- Shearing force failure load: 40kg

- Supply capability: 3000m/day, L=6600mm  T=18mm&T=21mm standard thickness, moisture content 10%

- Surface Coating: waterproof, yellow painting or as requirements

- Density: 600kgs/cubic meter

- Application: Slab formwork system, vertical formwork, adjustable arced formwork, etc.


4. CMAX Timber-beam Formwork Images


Timer Beam Formwork H20 System for Construction

Timer Beam Formwork H20 System for Construction


5.  FAQ of Timber-beam Formwork

1) What can we do for you? 

We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

We can provide you the professional design team.    

We can provide fashionable and newest styles for you.    

We can design the artwork for you.    

Please feel free to customize.  

 

2) What promises can be done by us?

- If interested in Timber-beam Formwork, please feel free to write us for any QUOTE.

- If printing required, please advise asap because the whole set need much more time to complete.

Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about the package and shipping time?

Packing:  As Customer's Requirements

Shipping: We have various shipping ways for our customers, such as express, by air/ sea etc.  

Shipping time: Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days.