Timber Beam with Easy Installation and Dismantle

Loading Port:Tianjin

Payment Terms:TT OR LC

Min Order Qty:5000 pc

Supply Capability:3000000 pc/month

Product Description:

 

1. Structure of Timber Beam Wall Formwork Description 

 

The formwork is made of plywood, timber beam and steel waling. Pull-push props can be designed according to the project or simply select the standard props. Tie-yoke and tie-rod are used to reinforce the corner. Timber beam formwork is a highly efficient and convenient system for medium area slab project. They can be transported to next position as whole table units whether by trolley or by crane lift.  

 

2. Main Features of Timber beam wall formworks

 

    -Fast in transportation and concrete casting due to pre-assmebled table unit.
    -Thus save more than a half time & labor cost compared with Slab Flex 20 formwork.
    -Can choose shoring props or towers according to different loadings and height.

 

3. Timber beam wall formwork Images

 

Timber Beam with Easy Installation and Dismantle

 

Timber Beam with Easy Installation and Dismantle

 

4. Timber Beam Formwork Specifications

 

Timber beam column formwork is used for the concrete pouring of square or rectangle column. The system has the same structure and similar connection type with wall formwork.

 

5.FAQ of  Timber Beam Formwork

   

1) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you. 

2) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.   

 3) What about the package and shipping time?

    .Packing: wood package and adhesive tape

    .Shipping: by sea

     Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks.