Timber Beam Formwork with Safe and Easy Operation

Loading Port:Shanghai

Payment Terms:TT or LC

Min Order Qty:1 m²

Supply Capability:10000000 m²/month

Product Description:

  1. 1.   Structure of Timber-beam Formwork

     Formwork is the term given to either temporary or permanent molds into which concrete or similar materials are poured. In the context of concrete construction, the falsework supports the shuttering moulds.Timber beam formwork is constructed with timber beam and push-pull props to let concrete pouing smoothly.

 

  1. 2.   Main Features of Timber-beam Formwork

.Production lines are standardized

.Transportation and storage are easy

     .Finger jointing of the flange and web, the strength of timer beam is highly improved


 

  1. 3.   Timber-beam Formwork Images



  1. 4.   Timber-beam Formwork Specification

.Shearing force failure load: 40kg

.Supply capability: 3000m/day, L=6600mm

.Lifespan:4~5 years

.T=18mm&T=21mm

.In standard thickness, moisture content 10%


   5.  FAQ of Timber-beam Formwork

    1) What can we do for you? 

-We provide the best quality of service for you

-We accept customized design

-We assure you the prompt delivery time 

 

   2) What promises can be done by us?

   . If interested in Timber-beam Formwork, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

  3) What about the package and shipping time?

    .Packing:  As Customer's Requirements

    .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Timber-beam Formwork, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.