Timber Beam Formwork for Cantilever Climbing Formwork

Loading Port:Tianjin

Payment Terms:TT or LC

Min Order Qty:200 m

Supply Capability:80000 m/month

Product Description:

1. Structure of Cantilever Climbing Formwork Description

Cantilever Formwork is  mainly used in the concrete pouring of pier, high buildings, and so on. The concrete lateral pressure is entirely supported by anchor system and the wall-through tie-rods, additional reinforcement is not needed.

 

2. Main Features of Cantilever Climbing Formwork

-Easy construction

-Economical and Rapid

-Perfect surface

3. Cantilever Climbing Formwork  Images

Timber Beam Formwork for Cantilever Climbing Formwork

 

Timber Beam Formwork for Cantilever Climbing Formwork

 

4. Cantilever Climbing Formwork Specifications

Main cantilever FormworkPJ200 & PJ240,CB-240 etc

The Structure Sketch PJ200

Timber Beam Formwork for Cantilever Climbing Formwork

 

Timber Beam Formwork for Cantilever Climbing Formwork

 

Anchor  system

Anchor system is the most important supporting part. The system is made of five parts shown below. There into, tensile bolt, anchor shoe and bowl-climbing cone can be taken out for reusing after the concrete pouring

Tensile bolt M30/L= 110

Anchor shoe

Bowl-climbing cone M30/D15

High-strength rod D15

Ancor plate D15

 

Timber Beam Formwork for Cantilever Climbing Formwork 

 

5. FAQ of Cantilever Climbing Formwork

 

1) What can we do for you? 

    .We can ensure the quality of the Cantilever Climbing Formwork and avoid extra expenses for customers.

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects.        

 

2) What promises can be done by us?

   . If interested in this kind of Cantilever Climbing Formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issueS.

 

3) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

    .Packing: wood package and adhesive tape

    .Shipping: by sea

     Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks.