Loading Port:Shanghai
Payment Terms:TT OR LC
Min Order Qty:10 m.t.
Supply Capability:7000 m.t./month
1.Structure of Thread Rod Descrition
material | carbon steel |
Surface process | hot galvanized |
Grade | 4.8 |
Line of produce nut | Chemical analysis --- acid pickling --- redrawing steel --- cut steel --- heating steel --- moulding --- polish --- heat treatment --- threading --- galvanized --- packing --- exported |
Line of produce bolt | Choose the high quality steel --- Chemical examination --- acid pickling --- redrawing steel --- cutting steel --- Welton --- examination --- rough process --- rolled thread --- precision process --- hardening and tempering --- hot galvanized ---examination --- packing --- exported |
packing | weave bag and pallet |
application | for cable support and construction material |
2.Main Features of Thread Rod
1). Competitive price and quality from our own factory
2). Approved by ISO9001, CE, SGS every year
3). Best service with 24 hour`s reply
4). Smooth production ability
5). Quick delivery and standard exporting package
3.Thread Rod Images
4.Specification of Thread Rod:
Material | 201,304,316 etc |
Size | 3,4,5,6.3,8,10,12,14,16,18,20,22,24,27,30,33,36 etc. |
Standard | DIN975 |
Color | Natural |
Delivery time | 7-30ays |
Packing | Cartons:26*25*16cm Wooden pallets for fumigation:90*85*10cm |
Advantages | Factory direct, quality assurance, price concessions, can be customizedaccording to customer specific needs of a variety of stainless steel bolts |
5.FAQ
1.Q: Could you send me your catalogue and price list?
A: As we have more than thousands of products, it is really too hard to send all of catalogue and price list for you. Please inform us the style you interested, we can offer the pricelist for your reference.
2. Q: How about the quality of your product?
A: 100% inspection during production. Our products are certified to ISO9001, TS16949 international quality standards.
3. Q: What material of the product can you supply?
A: Carbon Steel, Alloy Steel, Stainless Steel, Brass, Copper or according to your requirement.
4. Q: What's the delivery time?
A: For products in stock, we can ship it within 7 days after receiving your payment. For custom order, within 24 tons, production time is 15-20 days after confirmed every details.