1. Structure of Table Formwork
Table formwork is used for the concrete pouring of wall.
The application of large areas formwork has greatly increased the construction efficiency and reduced the cost.
The system has two parts, formwork and pull-push props. The formwork is made of plywood, timber beam and steel waling.
Pull-push props can be designed according to the project or simply select the standard props.
2. Main Features of Table Formwork
Light weight
For any storey heights and slab thickness.
Easy connection with adjustable steel clamp
Convenient for construction
Fast in transportation and concrete casting due to pre-assmebled table unit.
Can choose shoring props or towers according to different loadings and height.
An optimum position of the table gravity point can be achieved by selecting the correct suspension points for the crane
ropes and testing it on site by trail lifts
3. Table Formwork Pictures
4. Table Formwork Specification
Vertical shifting of table formwork is considered simplified on site with the help of Transport fork by crane.
An optimum position of the table gravity point can be achieved by selecting the correct suspension points for the crane
ropes and testing it on site by trail lifts.
The shifting trolley enables you to lower the table from the floor slightly and transport the table horizontally to the next
location easily.
5. FAQ of Table Formwork
What about of our after-sale service?
Response will be carried out in 24hours after receiving any complain or request.
Aluminum-Frame Formwork cost can be refund after order is confirmed.
If the products are not based on the requirements, there will be the relevant compensations made for you.
What can we do for you?
We can ensure the quality of the vinyl banner and avoid extra expenses for customers.
We can provide you the professional design team.
We can provide fashionable and newest styles for you.
If printing required, please advise asap because the whole set need much more time to complete.
Please DO check goods when courier knocks your door and contact us asap if any issue.
What about the package and shipping time?
Packing: wood package and adhesive tape.
Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs.
declaration, it may need 2weeks.