Stud and Track for Drywall Wall Partition

Loading Port:Tianjin

Payment Terms:TT OR LC

Min Order Qty:1000 pc

Supply Capability:500000 pc/month

Product Description:

Stud and Track for Drywall Wall Partition


1. Galvanized Steel Profiles raw material is high quality hot dipped zinc galvanized steel strip, absolute damp proof , heat insulation and high durability , high rust resistance.
2. Hot dipped zinc galvanized stee strip zinc coating is 80-180g/m2.
3.Warm sales in Middle East , Africa ,  Malaysia ,and America , which have enjoyed an excellent reputation with high quality and services
4. The specification can follow up customer requirments.
5. Advanced equipment can make sure exactly size, high quality products.

 

Drywall 35*22*12*68, thickness 0.45mm - 1.0mm,length 2.8mm,2.9mm,3mm

Drywall

Drywall channel system some sizes as follows:
a) Stud:
       70x35x3000x0.45/0.5/0.6mm
       50x35x3000x0.45/0.5/0.6mm
      
b) Track:
       72x25x3000x0.45/0.5/0.6mm
       50x25x3000x0.45/0.5/0.6mm

 

Furring ceiling system some sizes as follows:
a) Furring channel: 35x22x12x300x0.45/0.5/0.6mm
b) Main channel: 38x10(12)x3000x0.45/0.5/0.6mm
c) G.I. Wall angle:
           25x25x3000x0.45/0.5/0.6mm
           23x23x3000x0.45/0.5/0.6mm
           22x22x3000x0.45/0.5/0.6mm
           20x20x3000x0.45/0.5/0.6mm 


Function and advantage

1.good quality, hot dip galvanized steel coil

2.light weight , easy install

3.surface: zinc coat, full with dot, high strength

4.strong bearing capacity, ametabolic

5.the production ability strong, 21 production lines-3200 tons per month

6.meet the GB standard 


Package and delivery time

Packing-- 10pcs/bundle, nude package with plastic strip

MOQ- 10tons, can negotiate

Delivery time-- commonly 2 weeks after received the 30% deposit

 

Application
1,Supermarket, marketplace

2,Underground, air port, bus station
3,Building lobby,metro station

4,Hotel, restaurant,railway station

5,School, office, meeting room ,hospital

6.commercial building


FAQ

1. Is OEM available?

Re: Yes, OEM service is available.

2. Are you factory?

Re: Yes. we are the largest factory in China.

3. Can we get sample?

Re: Yes, sample is free for our customer.

4. How many days for production

Re: usually 2 weeks after receiving of downpayment

 

Pictures:

Stud and Track for Drywall Wall PartitionStud and Track for Drywall Wall Partition