Steel Sheet Piling/European Standard U Steel Sheet Pile/hot rolled steel sheet piles

Loading Port:Tianjin

Payment Terms:TT OR LC

Min Order Qty:1000 m.t.

Supply Capability:10000 m.t./month

Product Description:

Quick Details

Standard:

GB,JIS

Grade:

Q420bz

Thickness:

12.8

Place of Origin:


Brand Name:


Model Number:

ZZKJ605

Type:

Steel Plate

Technique:

Hot Rolled

Application:

Strengthening protection

Special Use:

High-strength Steel Plate

Width:

600

Length:

6000-12000CM

Packaging & Delivery

Packaging Detail:in bulk/with your requirements
Delivery Detail:one month

Specifications

1.hot rolled U steel sheet pile 
2.high efficient energy 
3.saving building materials

The use of steel sheet pile

 

Hot rolled U steel sheet pile is a kind of high efficient energy saving building materials.Widely used in embankment, a loading dock, dock, temporary Island, dyke, Luqiao, temporary pier revetment revetment, waterproof cofferdam, river, embankment reinforcement, retaining wall, retaining wall and the construction foundation pit bracing structure of foundation engineering

 

Steel sheet pile application advantage

 

Hot rolled U steel sheet pile is meet the basic structure and function, safe and reliable and efficient environmental protection characteristic.The main advantages are as follows.

 

1. strong bearing capacity, its light structure.Steel plate pile continuous wall with very high strength and rigidity

 

2. good water tightness.Steel sheet pile connection locking tightly combined natural seepage

 

3. simple construction.Can adapt to different geological conditions and soil can reduce the excavation of earthwork.Operation occupies smaller venues

 

4. good durability.As the use of environmental differences, life up to 50 years

 

5. construction of environmental protection.Soil and concrete substantially reduced amount, can effectively protect the land resources

 

6. high efficiency.Very suitable for fast implementation of flood protection, collapse, quicksand, earthquake disaster rescue and prevention.

 

7. the repeated use of recyclable materials.In temporary works can be used 20-30 times

 

8. compared with other monomers structure, wall is light and has greater adaptability to deformation, is suitable for various geological disaster prevention management.