Steel Frame Formwork with Higher Quality for Construction Building

Loading Port:Shanghai

Payment Terms:TT OR LC

Min Order Qty:1 m²

Supply Capability:100000000 m²/month

Product Description:


1. Structure of Steel Frame Formwork GK120 Description 


There is a prizing part designed in the corner, which can help to position and remove formwork easily.The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.


-convenient for construction-easy to control the quality-easy, rapid and economical.

3. Steel Frame Formwork GK120 Images

 Steel Frame Formwork GK120Specifications

Steel Frame Formwork GK120 is used for the concrete pouring of square or rectangle column. The system has the same structure and similar connection type with wall formwork.

 


4.Steel Frame Formwork GK120


1) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  


 2) What about the package and shipping time?

    .Packing: wood package and adhesive tape

    .Shipping: by sea

     Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks.