Steel Frame Formwork GK120 with High-effective Performance for Large Projects

Loading Port:Tianjin

Payment Terms:TT OR LC

Min Order Qty:200 pc

Supply Capability:3000000 pc/month

Product Description:

 

1. Structure of Steel Frame Formwork GK120

 

There is a prizing part designed in the corner, which can help to position and remove formwork easily.

The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.

The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.

 

2. Main Features of Steel Frame Formwork GK120

 

 

 3. Steel Frame Formwork GK120 Images

 

 

Steel Frame Formwork GK120 with High-effective Performance for Large Projects

 

Steel Frame Formwork GK120 with High-effective Performance for Large Projects

 

Steel Frame Formwork GK120 with High-effective Performance for Large Projects

 

 

4. Steel Frame Formwork GK120 Specification

 

-The steel frame formwork is plywood covered with hollow steel. The plywood is 18 mm thick.

-The frame is highly strengthened, and the wall formwork can bear lateral pressure 60 KN/m2 while the column formwork can bear 80 KN/m2.

-There is a prizing part designed in the corner, which can help to position and remove formwork easily.

-The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.

-The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.

 

5. FAQ of  Steel Frame Formwork GK120

   

1) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you. 

2) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Steel Frame Formwork GK120 cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.   

 3) What about the package and shipping time?

    .Packing:  As Customer's Requirements

    .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, 

     etc.by air/ sea, and we are VIP of these express.  

   .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7

    days.