Loading Port:China main port
Payment Terms:TT OR LC
Min Order Qty:5000 m²
Supply Capability:100000 m²/month
Description
itis a modified bitumen base sheet consisting of polymer modified asphalt added viscosifier inside covering with different upper separated materials and underside with silicone antisticking layer. According to different upper surface, it includes three types: PE film surfacing (SAM-930APE), sand surfacing (SAM-930AS) and antisticking surfacing (SAM-930AN). There have two kinds of thickness: 3.0 mm and 4.0 mm.
Item | Requirement | ||
Soluble matter content, g/m 2 ≥ | 3 mm | 2100 | |
4 mm | 2900 | ||
Tensile property | Tensile strength, N/50mm ≥ | 3 mm | 600 |
4 mm | 800 | ||
Elongation at the maximum tensile force, % ≥ | 40 | ||
Resistance to heat( degree centigrade ) | 70, No sliding, flowing, dripping | ||
Flexibility at low temperature,( degree centigrade ) | -30 | ||
No cracking | |||
Water tightness | Pass at 0.3 MPa, 120 min | ||
Sheering properties N/50mm | Between membranes ≥ | 1.0 | |
Between membrane and aluminum plate ≥ | 1.5 | ||
Shank watertight | Pass | ||
Immersed in oil, pieces ≤ | 2 | ||
Holding Power/ min ≥ | 15 | ||
Thermal ageing | Elongation at the maximum tensile force, % | 40 | |
Flexibility at low temperature,( degree centigrade ) | -28 | ||
No cracking | |||
Sheering properties between membrane and aluminum plate, N/mm | 1.5 | ||
Dimension stability, % ≤ | 1.0 | ||
Self-adhesive bitumen re-peel strength, N/mm ≥ | 1.5 |
Usage
Roofs or undergrounds.
Swimming pools, fire pools and reservoirs;
Subways or tunnels;
Open fires-forbidden construction areas;
Cold construction areas.
Advantages
Self adhesive, safe and environment-friendly;
Good tensile strength and elongation;
Strong adaptability for substrate shrinkage, deformation and cracks;
It will be a high-strength membrane to resist water;
Penetration-resisting and corrosion-resisting;
Excellent flexibility in low temperature;
Strong self healing ability for penetration and cracks.
FAQ
1. Is sample available before place orders?
A:Yes, sample is ok。
2. How long is the dispatch period?
A: It will be around 20-30 days.