Loading Port:China Main Port
Payment Terms:TT OR LC
Min Order Qty:-
Supply Capability:-
Model Number: | |||||
type: | useage: | surface treatment: | |||
OD: | Thickness: | payment terms: | |||
lead time: | MOQ: | application: | |||
package: |
Packaging Detail: | standard packaging or according to the customers' requirements for scaffolding |
Delivery Detail: | within 15 days for scaffolding |
scaffolding
1.construction material steel pipes&beams scaffolding
2.High quality construction steel scaffolding
scaffolding
scaffolding with galvanized
Introduction
We are manufacturer specialized in scaffolding&formwork materials. Our best-selling products areslab formwork system(Patent No:ZL200420091863.6). It's adjustable system, very time-saving and labor-saving.
They replaced timbers,steel pipe&couplers.Wasting of timbers and couplers can be avoided. Moreover, this system can quicken construction period and improve quality of concrete casting.
2. Product Details and Show
a. Main Beam & Sub Beam ( replace H20 wood beam and aluminium I beam)