Loading Port:China Main Port
Payment Terms:TT OR LC
Min Order Qty:-
Supply Capability:-
Place of Origin: | Brand Name: | Model Number: | |||
Usage: | Material: | Structure: | |||
Standard or Nonstandard: |
Packaging Detail: | Plastic bags with steel pallet or as your requirment |
Delivery Detail: | Within 7-15 days after receiving your prepayment |
scaffold ladder clamp
1.Material:carbon steel
2.Surface: HDG, galvanized, gold color galvanized, self-colour
scaffold ladder clamp
Packaging & Delivery | |||||
Packaging Detail | Plastic bags with steel pallet or as your requirment | ||||
Delivery Detail | Within 7-15 days after receive the prepayment | ||||
Specifications | |||||
Material | steel | ||||
Surface | HDG, galvanized, gold color galvanized, self-coloured | ||||
Appearance | Self-color(Black) , White, Yellow | ||||
Nut | 21mm,22mm,23mm | ||||
T-bolt | 80mm,89mm | ||||
Weight | 0.6~1.5kg or as your requirement | ||||
Min. Slip Load | 12.5KN | ||||
Distortion Load | 17 KN |