Loading Port:China Main Port
Payment Terms:TT OR LC
Min Order Qty:-
Supply Capability:-
Thickness: | Outer Diameter: | ||||
Place of Origin: | Secondary Or Not: | Application: | |||
Technique: | Certification: | Surface Treatment: | |||
Special Pipe: | Alloy Or Not: | color: | |||
certificate: | Key word: | Thicknss tolerance: | |||
Payment: | pipe end: | Packaging Detail: | |||
Grade: | Standard: |
Packaging Detail: | 1) Bundle, 2) In Bulk 3) Bags 4) Clients' Requirements |
Delivery Detail: | within 10-15 days after receipt deposit or irrevocable LC |
black scaffolding steel tube
1. OD: 21.3mm---------219.1mm
Thickness: 1.0mm-------10mm
2. Length: 5.
First: Company introduce
We are Professional manufacturer for GALVANIZED PIPE,ERW SQUARE HOLLOW SECTION,BLACK PIPE.
Founded on May 1st,2005,situated in Xizhaizhuang Town Industrial Estate,Tianjin..Thanks to good quality and a great veriety,our products are very popular among new and old customers and are export to such regions and countries as Southeast Asia and Middle East.
Second: Product Information
Black steel pipe/tubes
1. OD: 20mm-----219mm WT:2.0mm----10mm
2. Tolerance: Thinckness,+/-0.05mm; Length,+/-10mm
3.Material: S235JR
4.Standard: ASTM/BS/GB/DIN
5.Surface: Varnish
6.Moq: 5ton
7. Usage: Greenhouse,Scaffold,highway,bridge
8.Payment:30%T/T advance+70%upon presentig shipping documents.
9. Trade Terms: CFR,CIF,FOB
Third: Size
Stock erw steel pipe
O.D (inch) | W.T.(mm) |
1/2” | 1.4--2.75 |
3/4” | 1.4--2.75 |
1” | 1.4--3.5 |
1-1/4” | 1.4--3.5 |
1-1/2” | 1.4--3.75 |
2” | 1.4--4.0 |
4” | 1.4--5.75 |
5” | 1.4--7.75 |
6” | 1.4--7.75 |
8” | 2.75--11.75 |