SBS Modified Bitumen Waterproof Membrane For Roof

Loading Port:Shanghai

Payment Terms:TT or LC

Min Order Qty:2000 m²

Supply Capability:200000 m²/month

Product Description:

Product description


Specification

Width

1m

Length / roll

7.5m / 10m / 15m or other

Top Surface

PE film/Granules/Sand/Aluminum foil/Aluminum film...

Apply method

a) One way is by heating and melting method.Heat the polyethylene film of the 

membrane and roof deck surface by heating and melting method to be nearly 

melted (not flowing),then install the membrane filly bonded to the roof deck with 

overlaps of 5-10cm.

b) The other way is by cold adhesive method.Pour the cold adhesive homogeneously 

on the roof deck, then roll the membrane to install it to be fully sticked to roof deck.
By heating and melting method and by cold adhesive can be used in alternation in 

application as requested.                                              

c)After application,a full serious inspection is required to sure no air bubble,

no falling away.etc. to guarantee the waterproof life.

SBS waterproof membrane / APP waterproof membrane / Asphalt waterproof membrane for building waterproofing construction

Construction

Requirement

1.The base should be dry and clean. Do not work in the rainy or snowy day.

2.Do not work under heavy wind(above 5 grade)

3.Unsuitable for construction below 5°C

4.If it is rain or snow in the process of construction, protective measure to the laid

 membrane is must.

5.All the workers should put on special uniforms to keep safe when installing. 

There should be equipments for fire controls. 

Packaging & Shipping


Package and transportation-- SBS waterproof membrane / APP waterproof membrane / Asphalt waterproof membrane for building waterproofing construction :

1. Torch on bitumen membrane sheets 4mm  should be stored under dry and ventilated conditions.

2. Different types of membranes must be piled separately.

3. Under usual condition, storage period is one year since production date.

4. Membrane roll should be put vertically during transportation. It should be kept away from sunshine and rainwater.

.  

 

Advantagee


1.Good impermeability

2.Possess good tensile strength, elongation and size stability which could be well suited the substrate distortion and crack.

3.Good performance in anti-strength, anti-resistance , anti-erosion, anti-mildew, anti-weathering

4.SBS modified bitumen membrane is specially being applied in the cold area with low temperature, while APP modified bitumen membrane is applied in the area with high temperature.

5.Convenient installation


 Applicable scope:


It is widely used for civil building roofing, underground, bridge, parking, pool, tunnel in the line of waterproofing and dampproofing, especially for the building under high temperature.

 

 

Storage:


Different types or specifications of products should be separated, not mixed.

Keep it dry and ventilated, protected from the sun or rain.

Storage temperature should never be higher than 45 °C. Pile up the membranes flatwise whose stockpile height never exceeds five layers. One layer is guaranteed if it is placed vertically.

Prevent it from inclination or In the process of transportation, it should be lying in case of inclination or lateral pressure. If necessary, cover it with felt-cloth.

Storage time is at least one year from manufacture date on if the product is under normal operation of storage.

 Technical Parameters




 

          Item

                                Index








1

Thickness of  resin layer of the   middle fabric ,mm≥

-

-

0.40 

0.40 

0.40

2

Tensile performance

Max tensile strength,N/cm ≥

-

120 

250

-

120

Tensile strength,NPa ≥

10

-

-10

-

-

Max elongation% ≥

-

-

15

-

-

Breaking elongation % ≥

200

150

-

200

100

3

Heat treatment size change rate%≤ 

2.0

1.0

0.5

0.1

0.1

4

Cold bonding

-25°c No cracks

5

Watertightness

0.3mPa,2h waterproof

 

product show

 




SBS Modified Bitumen Waterproof Membrane For RoofSBS Modified Bitumen Waterproof Membrane For Roof

SBS Modified Bitumen Waterproof Membrane For RoofSBS Modified Bitumen Waterproof Membrane For RoofSBS Modified Bitumen Waterproof Membrane For Roof

SBS Modified Bitumen Waterproof Membrane For RoofSBS Modified Bitumen Waterproof Membrane For RoofSBS Modified Bitumen Waterproof Membrane For RoofSBS Modified Bitumen Waterproof Membrane For RoofSBS Modified Bitumen Waterproof Membrane For Roof

SBS Modified Bitumen Waterproof Membrane For Roof

SBS Modified Bitumen Waterproof Membrane For Roof

SBS Modified Bitumen Waterproof Membrane For Roof

SBS Modified Bitumen Waterproof Membrane For Roof

SBS Modified Bitumen Waterproof Membrane For Roof

FAQ




Q: What's the de6abf1fe186f8d58506cbcfe46eed814d.jpglivery time ?

A: 3-5 days for 1-600 rolls, 10-15 days for container.

Q: What's the payment terms ?

A:   TT/LC

Q: How do you make replacement with quality problems ?

A: New replacement will be packed into your next order or send to you directly after receive video or photo about quality problems.