Loading Port:China Main Port
Payment Terms:TT OR LC
Min Order Qty:-
Supply Capability:-
Model Number: | |||||
type: | construction: | scaffolding: | |||
material: |
Packaging Detail: | waterproof packing |
Delivery Detail: | 15-20 days after payments |
1.time saving,labor saving
2.competitive price
3.ISO9001 approved
4.high rigidity , good durability and long service life
PRODUCT SPECIFICATION | ||||||
Title | Length(m) | G.W.(kg) | Diameter (mm) | Thickness(mm) | Material | Surface Finish |
vertical props | 2.55 | 8.85 | 48 | 2.75~3.00 | Q235 | Electrophoretic Painting |
1.95 | 6.60 | 48 | 2.75~3.00 | Q235 | ||
1.35 | 4.81 | 48 | 2.75~3.00 | Q235 | ||
1.05 | 3.88 | 48 | 2.75~3.00 | Q235 | ||
0.75 | 2.61 | 48 | 2.75~3.00 | Q235 | Electrophoretic Painting | |
horizontal props | 1.22 | 3.90 | 48 | 2.75~3.00 | Q235 | |
0.87 | 2.79 | 48 | 2.75~3.00 | Q235 | ||
0.47 | 1.60 | 48 | 2.75~3.00 | Q235 |
CHARACTERISTICS OF OURS | ||||||
Unlike traditional steel tube scaffold, this new scaffold system is all made of steel and not need wood timbers at all , it can save a lot of time, labor and money . |