Loading Port:China Main Port
Payment Terms:TT OR LC
Min Order Qty:-
Supply Capability:-
Type: | Scaffolding Part Type: | material: | |||
sample: |
Packaging Detail: | packing in polywoven bag or as customers' request |
Delivery Detail: | within 2 weeks after confirming the order |
Artical No. | weight k/pc | surface | weldable |
MTH0420 | 450 | black | yes |
MTH0421 | 450 | galvanized | yes |
1.Dedicated attitude and attention on metal-forming industry;
2.Specialized in stamping, casting, forging process;
3.Completed product delivery system from 2D and 3D drawing design,Drawings checking, accurate first time samples, sufficient leadtime,Strict batch production control to final shipping on time.
4. Many cooperated factories in steady and long term relation, more than 3 factories for you to compare and choose for each item, then it optimizes and utilizes all the resources. We make sure our clients get their required products by reasonable cost.
Q235 Galvanized ringlock scaffolding ledger end
Name | Ringlock scaffolding |
Size | as your request |
Main Material | Q235, Q195 etc; |
Surface Treatment | High Protected Painted, Powder Coating, Electric Gavenized, Hot Dip Gavenized etc |
Color | As per the client request |
Certificate | BV |
Features | Automatic Welding |
Service | OEM Service available |
MOQ | One container |
Payment | T/T,L/C Western Union, Money Gram etc |
Delivery Time | About 5~20days after confirmation |
Packing | In bulk or steel pallet or as your request |
Production capability | 300000 pieces/Morth |