Ring-lock Scaffolding with Cold Galvanized Surface Treatment and Hot Deep Galvanized

Loading Port:Tianjin

Payment Terms:TT OR LC

Min Order Qty:300 pc

Supply Capability:300000 pc/month

Product Description:

1. Structure of Ring-lock Scaffolding


      It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference&         exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of    

      electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple     

      roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.

Scaffolding consists of various kinds of accessories, including pipe, tube, brace, and platform and so on. Scaffolding tube is made of steel or aluminum. It can be erected to a great height to help workers accomplish their work more conveniently and safe.


2.   Main Features of Ring-lock Scaffolding




3.   Ring-lock Scaffolding Pictures


Ring-lock Scaffolding with Cold Galvanized Surface Treatment and Hot Deep Galvanized



Ring-lock Scaffolding with Cold Galvanized Surface Treatment and Hot Deep Galvanized


     4.  Ring-lock Scaffolding Specification


     As a standardized system, it is flexible to assemble , wood batten can be filled to satisfy the need f of non-standard size.

     The adjustable steel clamp is convenient to use, and can hold tightly.

     There is a prizing part designed in the corner, which can help to position and remove formwork easily.

     The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is     

     perfect.

     Ring-lock Scaffolding has no special retaining member and no active parts. It’s easy and convenient to operation with integral   

     low costs.



     5.  FAQ of Ring-lock Scaffolding



     What about of our after-sale service?

     Response will be carried out in 24hours  after receiving any complain or request.

     Aluminum-Frame Formwork cost can be refund after order is confirmed. 

     If the products are not based on the requirements, there will be the relevant compensations made for you.

     Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7        days. 

     Other mass qty of Ring-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight      for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.