Loading Port:Ningbo
Payment Terms:TT OR LC
Min Order Qty:7000 m²
Supply Capability:180000 m²/month
Product Overviews
Quality check:Strict production process with quality check one by one.
Function:sunscreen,blackout light bloking, heat insulation, noise reduction, UV-anti.
Material Available:
1.Best quality back color coated and silver coated polyester fabric full blackout roller blinds.
2.Best quality back chamois suede and 100% polyester fabric full blackout roller blinds.
3.Best quality surface gauze and 100% polyester fabric adjustable sunscreen blackout light filtering day and night zebra roller blinds.
4.Best quality 100% polyester fabric printed flower patterns semi blackout roller blinds.
5.Best quality cheap polyester fabric sunscreen semi blackout roller blinds.
6.Other produce:Pvc and aluminum venetian blinds;Pleated blinds;Elegant shangri-la roller blinds;Natrual solid bamboo roller blinds;Printed pattern bamboo sliding door.
large cargo:
Delievery time | 45-60days after confirm the order(the 20GP)or within 15-45 days(less than 500 pieces). |
We can supply | Accept the logo printed and also some design of yours. |
Packing | Packing method can according to your request. |
shippment | DHL, TNT, UPS, FEDEX. |
Payment | paypal,TT,TP |
Free sample | We can supply you free sample after you make the order of large cargo. |
features:
1. Total Control with The Wireless Controllers;
2. Automatic limit setting;
3. AC Powered 120/240V Electric Mains Power;
4. Super Slim installing head, 12mm only, it reduces the lights to get in from the spacing against the wall.
5. Buitl-in RF receiver, More than 50 meter distance remote control.
6.Beautify your rooms
7.Control your privacy
8.Protect your furnishings
9.Adjust your ambient lighting
10.Deliver energy savings
FAQ
Q:Are you manufactory or trade company?
A: We are manufacturer .Our factory located in Guangzhou, China and welcome to visit.
Q:How long is the sample lead time?
A:Sample lead time:5- 7days if you don't need customized.
If you need the products be customized,the sample lead time will be 7 days.
Q:How long is the production lead time?
A:Production lead time: 20-30 days for 10,000 SQM-100,000 SQM.
Q: How many colors available?
A:Color available:White,Ivory,Nutmeg,Cream,Super white,Medium to Dark,Light to Medium.
We can also do the color according to your requirement.
photo: