Loading Port:China main port
Payment Terms:TT OR LC
Min Order Qty:1 set
Supply Capability:1000 set/month
Brief Introduction:
1.Overall haulage with only a 5t vehicle for whole machine transportation. Haulage size can smoothly pass all standard bridge and culvert.
2.After quick erection, it can start working normally within one hour.
3.Correctly-positioned mechanism kinematics spacing.
4.High precision and reliable load moment limiter and load lifting limiter.
5.Special system: wheelbarrow persist axis break
6.Two purpose: arm-brace fixing and orbit walking
7.Overall haulage bridge can be easily altered into a transport tow (10t)
8.35m height and could be used 30 degree higher up
9.Crane body locked automatically, crane jib docked automatically, pulley at jib point positioned automatically. There is no artificial high-altitude operation through the whole erection and dismantling process.
Max.Lifting moment | 40 tm | |||||||
Lifting capacity | 4 Ratio | 4~11m | 11~36m | |||||
4.0t | 4.0~1.1t | |||||||
2 Ratio | 4~21m | 21~36m | ||||||
2.0t | 2.0~1.1t | |||||||
Lifting speed | Ratio | α=2 | α=4 | |||||
ton | 2 | 1 | 4 | 2 | ||||
m/min | 0~24 | 0~29 | 0~12 | 0~14.5 | ||||
Slewing speed | 0~0.65r/min | |||||||
Trolleying speed | 20/30m/min | |||||||
Erect Height | 30.9m | |||||||
Working temperature | -20℃~+40℃ | |||||||
Total power | 24.9KW | |||||||
Lifting mechanism | Motor | Model | YEJ160M-4 | |||||
Power(kW) | 11 | |||||||
Speed(r/min) | 1460 | |||||||
Uplifting mechanism | Motor | Model | YEJ100L2-4 | |||||
Power(kW) | 11 | |||||||
Speed(r/min) | 1430 | |||||||
Slewing mechanism | Motor | Model | YLEW112L-55-6B1 | |||||
Moment(N.m) | 55 | |||||||
Trolleying mechanism | Motor | Model | YDEJ100L-4/6 | |||||
Power(kW) | 2.2/1.5 |