Loading Port:Tianjin
Payment Terms:TT OR LC
Min Order Qty:50 m²
Supply Capability:200000 m²/month
Prefabricated School Dormitory, Flat Pack Pu Rock Wool Sandwich Panel House
Product Name: Design Sandwich Panel Container Prefabricated House
Low Cost EPS/PU Sandwich Panel Prefabricated House, often referred to as prefab homes or simply prefabs, are specialist dwelling types of prefabricated building, which are manufactured off-site in advance, usually in standard sections that can be easily shipped and assembled. Some current prefab home designs include architectural details inspired by postmodernism or futurist architecture.
Specification
Name | Type | Material | Size |
Wall Panel | 1.wall panel with steel sheet on both external and internal sides(LO)2. wall panel with steel sheet on external side and chipboard on internal side (KO) | 1.EPS 2.Mineral Wool 3.PU 4.Glass Wool 5.fiber cement | Width:1150mm Thickness : Customizable (rang from 50mm to 100mm) |
Door | 1.Steel Door 2.Aluminum Door 3.Aluminum Alloy Door 4.PVC Door 5.Fireproof Door | 1.Honeycomb Paperboard 2.EPS 3.PU | Steel Security door,800mm*2000mm Customizable |
Window |
1.Sliding Window 2.Tilt & Turn Window | 1.PVC 2.Aluminum Alloy | PVC Sliding window with Rolling shutter,1100mmx800mm Customizable
|
Electrical Installation | Switch and Socket | 1. CE Standard 2. Australia Standard 3. UL Standard | |
Electrical Circuit |
Packing
one 40HQ container loads about 100-140sqm of house.
The package method is bulk in container.
Installation
We send engineer to teach local workers to install and assembly.
4-6 workers can install a set of 100sqm house within 7 days.
The founation shall be used concrete ground or steel structure construction on pillars.
FAQ
1. Q: How much is this house?
A: Please provide with your house drawing and project location, because different design, different location effect the house materials quantity and steel structure program.
2. Q: Do you do the turnkey project?
A: Sorry, we suggest customer to deal with the foundation and installation works by self, because local conditions and project details are well knowb by customers, not us. We can send the engineer to help.
3. Q: How long will your house stay for use?
A: Our light steel prefab house can be used for about 70 years.
4. Q: How long is the erection time of one house?
A: for example one set of 200sqm house, 8 workers will install it within 45 days.
5. Q: Can you do the electricity,plumbing and heater?
A:The local site works had better to be done by the customers.