Pre-painted Steel Coil for Super Cold Room Building

Loading Port:Shanghai

Payment Terms:TT OR LC

Min Order Qty:100000 m.t.

Supply Capability:12000 m.t./month

Product Description:

1.Structure of Pre-painted Galvanized Steel Description

With GI as base metal, after pretreatment and liquid dope with several layers of color, then after firing and cooling, finally the late steel is called pre-painted galvanized steel which is good capable of decoration, molding, corrosion resistance.

2.Main Features of Pre-painted Galvanized Steel:

• Excellent process capability

• Smooth and flat surface

• Workability, durability

• Excellent heat resistance performance

• High strength

• Good formability

• Good visual effect

3. Pre-painted Galvanized Steel Images

 

 

 

Pre-painted Steel Coil for Super Cold Room Building

 Pre-painted Steel Coil for Super Cold Room Building

4. Pre-painted Galvanized Steel Specification

Standard: JIS G3312 ASTM 755M, EN10169

Grade: CGCC,CS, DX51D

Thickness: 0.16mm~1.5mm,0.16-1.5mm

Width: 1250,600-1250mm

Coil weight:3-12 MT

Coil ID:508/610mm

Chemical composition:

C

Si

Mn

Cr

Ni

P

S

0.150

0.476

11.231

12.50

0.900

0.039

0.010

 

 

 

 

 

 

 

 

 

5.FAQ of Steel

We have organized several common questions for our clients,may help you sincerely:

1.How about your market

Main markets are Middle-east, South-east Asia, South America

 

2 How many lines?

3 lines for prepainted steel coil

 

3. How many workers

300

 

4.How to guarantee the quality of the products

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

 

5. How long can we receive the product after purchase?

Usually within thirty working days after receiving buyer’s 30% advance payment or LC. We will arrange the factory manufacturing as soon as possible. The cargo readiness usually takes 15-25 days, but the shipment will depend on the vessel situation.