Pre-Painted Galvanized/Aluzinc Steel Coil Workability Durability

Loading Port:China main port

Payment Terms:TT OR LC

Min Order Qty:50 m.t.

Supply Capability:10000 m.t./month

Product Description:

 

1. Pre-Painted Galvanized/Aluzinc Steel Coil Workability  Durability

With GI as base material, after pretreatment (degrease and chemical treatment ) and liquid dope with several layers of color, then after firing and cooling, finally the plate steel is called pre-painted galvanized (aluzinc) steel. Pre-painted galvanized steel is good capable of decoration, molding, corrosion resistance. It generally displays superior workability, durability and weather resistance.

2.Main Features of the Pre-Painted Galvanized/Aluzinc Steel Coil

• Excellent process capability

• Excellent heat resistance performance

• Good visual effect

3.Pre-Painted Galvanized/Aluzinc Steel Coil Images

Pre-Painted Galvanized/Aluzinc Steel Coil Workability  Durability

Pre-Painted Galvanized/Aluzinc Steel Coil Workability  Durability

4.Pre-Painted Galvanized/Aluzinc Steel Coil Specification

Standard: AISI, ASTM, BS, DIN, GB, JIS

Grade: DX51D, DX52D

Thickness: 0.17-2.0mm

Brand Name: KMRLON

Model Number: coil

Type: Steel Coil

Technique: Cold Rolled

Surface Treatment: Coated

Application: Boiler Plate

Special Use: High-strength Steel Plate

Width: 20-1250mm

5.FAQ of Pre-Painted Galvanized/Aluzinc Steel Coil

1. What’s the application of this product?

Roof, roof structure, surface sheet of balcony, frame of window, etc.

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

2. How long can we receive the product after purchase?

Usually within thirty working days after receiving buyer’s advance payment or LC. We will arrange the factory manufacturing as soon as possible. The cargo readiness usually takes 15-25 days, but the shipment will depend on the vessel situation.