Plastic To Copper PPR Three Tee Fittings of Industrial Application Made in China

Loading Port:Shanghai

Payment Terms:TT OR LC

Min Order Qty:1000 pc

Supply Capability:100000 pc/month

Product Description:

Product Overview

1) Cold / hot water supply facilities for public buildings 
2) Food, chemical, electronic industry pipeline networks; Such as Pipeline networks for transporting all kinds of    corrosive liquids 
3) Drinking water production system pipeline networks; Such as Pure water and mineral water 
4) Air conditioning facility pipelines 
5) Compressed gas pipeline networks for industry 
6) Pipeline networks for swimming pools 
7) Pipeline networks for solar energy facilities 
8) Agriculture and garden production transporting systems


Our Services

1. OEM Manufacturing welcome: Product, Package...
2. Sample order
3. We will reply you for your inquiry in 24 hours.
4. after sending, we will track the products for you once every two days, until you get the products. When you got the
goods, test them, and give me a feedback.If you have any questions about the problem, contact with us, we will offer
the solve way for you.


Product Description

Product name

Size

Weight

Pack

 

 

 

 

 

 

 

Equal tee


(Gram/m)

(m/pack)

T16

12.5

1300

T20

19.4

800

T25

30.5

450

T32

48.2

260

T40

90.8

150

T50

142.5

106

T63

275.3

54

T75

515.0

30

T90

712.0

18

T110

1082.0

12

T125

1544.0

8

T160

2531.0

4


Product Show

PPR Three Tee Fittings of Industrial Application Made in China

PPR Three Tee Fittings of Industrial Application Made in China

PPR Three Tee Fittings of Industrial Application Made in China


FAQ

1. Can you find a translator for me?
You can tell us which language you speak, we will find the translator for you, and will be together work.
2. If we want to develop some new item, but maybe we just have some ideas, how can you do?
We can make new mold base on your idea, generally, if your quantity is more enough, we can refund the mold cost to you.   
3. How Long Is Delivery?
Delivery time will be 30-45 days according to order quantity.
4.What Is Our Normal Payments Terms?
Our normal payment terms: T/T, L/C or western union.