Loading Port:Shanghai
Payment Terms:TT OR LC
Min Order Qty:200 pc
Supply Capability:100000 pc/month
Product Introduction:
1) Cold / hot water supply facilities for public buildings
2) Food, chemical, electronic industry pipeline networks; Such as Pipeline networks for transporting all kinds of corrosive liquids
3) Drinking water production system pipeline networks; Such as Pure water and mineral water
4) Air conditioning facility pipelines
5) Compressed gas pipeline networks for industry
6) Pipeline networks for solar energy facilities
7) Agriculture and garden production transporting systems
Features:
1. Light weight, easy and quick assembly
2. Most suitable for carrying drinking water
3. Excellent corrosion and chemical resistance
4. Bacteriologically neutral
5. Low thermal conductivity
6. Safe and watertight joints
7. Reduce heat loss
8. High impact strength
9. Resistance to scaling
10. Resistance to frost
11. Usable in seismic areas
12. Resistance to abrasion
13. Resistance to stray current
14. Eco-friendly
15. Long operational durability
16. Overall Economical
Our Services:
MOQ | FCL, 25 metric tons per 20GP, can be assorted with different sizes. |
LCL for trial order is acceptable. | |
Price Term | EX-WORK, FOB China Port, CNF, CIF |
Payment | T/T,D/A,D/P, 30% advanced payment before production and balance before shipment; OR Irrevocable L/C at sight. |
Delivery Time | within 30 days of receipt of LC original or prepayment |
Product Description:
Pressure | Size(mm) | Pressure | Size(mm) |
PN1.25MPA | 20*2.0 |
PN1.6MPA | 20*2.3 |
25*2.3 | 25*2.8 | ||
32*2.9 | 32*3.6 | ||
40*3.7 | 40*4.5 | ||
50*4.6 | 50*5.6 | ||
63*5.8 | 63*7.1 | ||
75*6.8 | 75*8.4 | ||
90*8.2 | 90*10.1 | ||
110*10.0 | 110*12.3 |
Product Show
FAQ
Q1: How Can I Get A Sample?
A1: You can get samples by communicate with our export sales.
Q2: How Long Is Delivery?
A2: Delivery time will be30-45days according to order quantity.
Q3: What Is The MOQ?
A3: MOQ depends on different items.
Q4: What Is Our Normal Payments Terms?
A4: Our normal payment terms now is: T/T, L/C or western union, pay