Loading Port:Tianjin
Payment Terms:TT OR LC
Min Order Qty:200 pc
Supply Capability:100000 pc/month
Introduction:
1) Cold / hot water supply facilities for public buildings
2) Food, chemical, electronic industry pipeline networks; Such as Pipeline networks for transporting all kinds of corrosive liquids
3) Air conditioning facility pipelines
4) Compressed gas pipeline networks for industry
5) Pipeline networks for swimming pools
6) Pipeline networks for solar energy facilities
Product Application:
1.Potable water for cold and warm water installations
2.For rainwater utilization systems
3.For compressed air plants
4.For swimming pool facilities
5.For solar plants
6.For agriculture and horticulture
7.Heating pipes for residential housing
Our Services:
MOQ | FCL, 25 metric tons per 20GP, can be assorted with different sizes. |
LCL for trial order is acceptable. | |
Price Term | EX-WORK, FOB China Port, CNF, CIF |
Payment | T/T,D/A,D/P, 30% advanced payment before production and balance before shipment; OR Irrevocable L/C at sight. |
Delivery Time | within 30 days of receipt of LC original or prepayment |
Product Description:
Pressure | Size(mm) | Pressure | Size(mm) |
25*2.3 | 25*2.8 | ||
32*2.9 | 32*3.6 | ||
40*3.7 | 40*4.5 | ||
50*4.6 | 50*5.6 | ||
63*5.8 | 63*7.1 | ||
75*6.8 | 75*8.4 | ||
90*8.2 | 90*10.1 |
Qulck Detials:
Material: PP-R, PPR
Technics: injection
Type: pipe
Place of Origin: China (Mainland)
Model Number: 20-110MM
Connection: Welding
Shape: Equal
Head Code: round
Product Type: Ppr pipe
Color: white, grey, green
Product Show:
FAQ
Q: What you offer?
A: Any kinds of goods you need, just send us the request, we will reply you back with the details very soon.
Q: Product quality and delivery time?
A: Normally 7-15 days after the order confirmed, we will collect the goods and inspect each of the items and send you the inspection photos for you to confirm.
Q: What's the regular shipping port?
A: Ningbo, Shanghai.
Q: What's your payment?
A: T/T or L/C at sight