Loading Port:China main port
Payment Terms:TT OR LC
Min Order Qty:1000 1000PCS
Supply Capability:100000 1000PCS/month
Item | Pipe Fittings |
Model | B07 - Pipe Fittings |
Material | PVC-U, PPR,CPVC |
Size | 1/2"~4" 20-110mm |
Color | White and gray for PVC,green ,grey, white and blue for PPR |
Standard | ASTM D2466, ASTM D2665 , BS4346, NBR5648, DIN8078 / 8077 |
Machines | Injection machines |
Technics | Casting |
Property | Connector |
Working Place | PVC -15°-55°,PPR-20°-90°,CPVC -20°-100° |
Warranty | At least 50 years |
Delivery time | 30-45 days after deposite, according to customers requirement |
Distribution for cool and hot water
Duct for drinkable water system
Pipes for kinds of high-temperature and low-temperature heating system
Pipes for heating and coolling settings in solar energy system
Connecting pipe for air conditioners
Product name | Size | Weight | Pack |
gram/m | (m/pack) | ||
equal tee | T16 | 12.5 | 1300 |
T20 | 19.4 | 800 | |
T25 | 30.5 | 450 | |
T32 | 48.2 | 260 | |
T40 | 90.8 | 150 | |
T50 | 142.5 | 106 | |
T63 | 275.3 | 54 | |
T75 | 515.0 | 30 | |
T90 | 712.0 | 18 | |
T110 | 1082.0 | 12 | |
T125 | 1544.0 | 8 | |
T160 | 2531.0 | 4 |
1.What is your MOQ?
MOQ depends on different items.
2.What is your delievery time?
The time of delievery is around 30-45days.
3.What is the shipping port?
We ship the goods via Ningbo or Shanghai port.